Level 3 - Designing, Engineering and Constructing a Sustainable Built Environment

Performance points for 2019 

Will be on UCAS Tariff Table from May 2018 onwards.

For Certificate: 30 credits required. Recommend Units 1, 2 and 3.

For Diploma: All 5 units Mandatory

[1] [2] [3] [4]

 

Level 3

Level 3, Unit 1 - Defining a Sustainable Construction Project (12 credits)

1. Research and convey the project remit.

2. Set standards for sustainability in a construction project.

3. Define site information required at pre-design phase.

1.1 identify a significant construction project for in-depth study. [5] 2.1 define commitments to positively impact on the local community and the local environment. [6] 3.1 identify the importance of site analysis and the roles of professional consultants at pre-design phase. [7]
1.2 communicate the vision for the project. [8] 2.2 define and explain commitments to energy and water efficiency and carbon reduction. [9] 3.2 determine requirements for topographical information including ways to collect accurate data for the site. [10]
1.3 set the scene for the project in the context of the existing environment. [11] 2.3 define and explain commitments to minimise construction waste. [12] 3.3 identify information required to produce a geotechnical report related to the specified project. [13]
1.4 set the scene for the project in the context of end users. [14] 2.4 define and explain commitments to ethical sourcing and responsible procurement. [15] 3.4 identify information required to produce an ecological study related to the specified project. [16]
1.5 write a mission statement for the project. [17] 2.5 define and explain sustainability monitoring and reporting procedures for the lifecycle of the project. [18] 3.5 identify information required to produce a hydrology study and relate to the specified project. [19]

Level 3, Unit 2 - Developing a Sustainable Construction Project (10 credits)

1. Prepare a design brief and take steps to appoint an effective design team.

2. Use building information modelling techniques for concept design.

3. Prepare information and resources needed to support a planning application.

1.1 describe the role and responsibility of the client in a construction project. [21] 2.1 create preliminary concept designs based on a design brief. [22] 3.1 explain the planning process for a specific construction project. [23]
1.2 prepare a design brief for a specific construction project and receive critical feedback for client sign off. [24] 2.2 assess concept designs for space requirements, circulation and accessibility. [25] 3.2 make use of current legislation and guidance. [26]
1.3 formalise the appointment of an integrated Project Team in contractual terms. [27] 2.3 assess concept design to produce preliminary cost and lifecycle cost prediction. [28] 3.3 prepare a planning feasibility study for a specific construction project. [29]
1.4 produce an organogram outlining professionals and their roles at each phase of the project. [30] 2.4 perform energy analysis relative to form, orientation, weather, surfaces and glazing. [31] 3.4 describe what is meant by the term ‘undesirable precedent’ in planning decisions and provide an example of such. [32]
1.5 devise an effective communication strategy to promote collaboration between all parties. [33] 2.5 present information for whole project lifecycle providing validation for chosen model. [34] 3.5 formulate justification and present evidence for the approval of a specific project. [35]

Level 3, Unit 3 - Support Design, Structural and Services aspects of a Sustainable Construction Project (8 credits)

1. Use building information modelling techniques to develop the design

2. Use building information modelling techniques to develop structural elements of a building project

3. Use building information modelling techniques to develop building services elements of a building project

1.1 define design elements and operational practicalities to provide the basis of a building information model [37] 2.1 define and create data rich structural elements including foundations, structural walls, slabs, beams and columns [38] 3.1 define and create appropriate systems from prior research, concept analysis and operational practicalities and constraints [39]
1.2 create an architectural model using materials with properties relevant to a sustainable construction project. [40] 2.2 apply science and mathematics to structural specifications. [41] 3.2 apply science and mathematics to assess and calculate energy efficiency in a range of scenarios. [42]
1.3 validate sustainable design ideas through production of data rich detailed 3D information [43] 2.3 validate structural engineering methods through production of data rich detailed 3D information [44] 3.3 validate building services proposals through production of data rich detailed 3D information [45]
1.4 present the design model to critical design experts. [46] 2.4 present the structural model to critical structural experts. [47] 3.4 present the services model to critical services experts. [48]
1.5 resolve design errors, clashes and omissions making modifications as a result of feedback. [49] 2.5 resolve structural errors, clashes and omissions and making modifications as a result of feedback. [50] 3.5 resolve service related errors, clashes and omissions making modifications as a result of feedback. [51]

Level 3, Unit 4 - Lifecycle and Financial Planning for a Sustainable Construction Project (10 credits)

1. Use building information modelling techniques to support the operational management of a building.

2. Understand cost analysis and financial control.

3. Produce a budget for a complex building project.

1.1 explain the role of BIM in the operation, management and maintenance of a sustainable building project throughout its lifecycle. [53] 2.1 explain the role of BIM in the financial management of a building project. [54] 3.1 compile an accurate list of capital costs. [55]
1.2 devise an appropriate handover process from the construction team to the end user. [56] 2.2 produce a cost model based on the project time line. [57] 3.2 provide an annual projection for recurrent fixed costs. [58]
1.3 set targets for whole life energy performance, water consumption, waste reduction, operation and maintenance costs [59] 2.3 identify points of accountability for keeping the project to budget. [60] 3.3 provide an annual projection for recurrent variable costs. [61]
1.4 analyse the impact of post occupancy behaviour on the life cycle of a building. [62] 2.4 explain the consequences of weaknesses in financial control. [63] 3.4 provide a sensitivity analysis based on possible variations in costs. [64]
1.5 describe the benefits of early engagement of the Facilities Manager and the client/end user in the design process [65] 2.5 devise policies for sustainable procurement to establish audit trails. [66] 3.5 present and negotiate variations to the design within budget constraints. [67]

Level 3, Unit 5 - Evaluating and Documenting a Sustainable Construction Project (10 credits)

1. Make objective comparisons between construction methods.

2. Communicate outcomes from professional perspectives.

3. Make a presentation of a summary report to a critical audience.

1.1 compare construction methods on the basis of aesthetics and appropriateness to design intent. [69] 2.1 explain the strengths and weaknesses of the design from a facilities management perspective. [70] 3.1 support a presentation with appropriate digital technologies. [71]
1.2 compare construction methods on the basis of cost. [72] 2.2 explain the strengths and weaknesses of the design from an architectural perspective. [73] 3.2 compare the client brief to the finished project and communicate to a professional audience. [74]
1.3 compare construction methods on the basis of sustainability. [75] 2.3 explain the strengths and weaknesses of the design from a structural engineering perspective. [76] 3.3 compare social, economic and environmental outcomes with planned intentions. [77]
1.4 compare construction methods on the basis of endurance and reliability. [78] 2.4 explain the strengths and weaknesses of the design from a building services engineering perspective. [79] 3.4 assess and validate the project’s major strengths and weaknesses with supporting evidence. [80]
1.5 compare construction methods on the basis of reduction of operating costs. [81] 2.5 explain the strengths and weaknesses of the design from an end user perspective. [82] 3.5 make clear judgements about the success of the project and lessons learned for the future. [83]

(function(i,s,o,g,r,a,m){i['GoogleAnalyticsObject']=r;i[r]=i[r]||function(){ (i[r].q=i[r].q||[]).push(arguments)},i[r].l=1*new Date();a=s.createElement(o), m=s.getElementsByTagName(o)[0];a.async=1;a.src=g;m.parentNode.insertBefore(a,m) })(window,document,'script','//www.google-analytics.com/analytics.js','ga'); ga('create', 'UA-46896377-2', 'auto'); ga('send', 'pageview');

Source URL: https://theingots.org/community/BIM-L3-Landing

Links
[1] https://theingots.org/community/sites/default/files/uploads/user4107/BIM_Level_3_RQF_v3.2_1.pdf
[2] http://register.ofqual.gov.uk/Detail/Index/31002?category=qualifications&query=TLM%20Level%203%20Certificate%20for%20Designing%2C%20Engineering%20and%20Constructing%20a%20Sustainable%20Built%20Environment%20(QCF)
[3] http://register.ofqual.gov.uk/Detail/Index/31004?category=qualifications&query=TLM%20Level%203%20Diploma%20for%20Designing%2C%20Engineering%20and%20Constructing%20a%20Sustainable%20Built%20Environment%20(QCF)
[4] https://theingots.org/community/RQF_Levels
[5] https://theingots.org/community/decl3u1x#1.1
[6] https://theingots.org/community/decl3u1x#2.1
[7] https://theingots.org/community/decl3u1x#3.1
[8] https://theingots.org/community/decl3u1x#1.2
[9] https://theingots.org/community/decl3u1x#2.2
[10] https://theingots.org/community/decl3u1x#3.2
[11] https://theingots.org/community/decl3u1x#1.3
[12] https://theingots.org/community/decl3u1x#2.3
[13] https://theingots.org/community/decl3u1x#3.3
[14] https://theingots.org/community/decl3u1x#1.4
[15] https://theingots.org/community/decl3u1x#2.4
[16] https://theingots.org/community/decl3u1x#3.4
[17] https://theingots.org/community/decl3u1x#1.5
[18] https://theingots.org/community/decl3u1x#2.5
[19] https://theingots.org/community/decl3u1x#3.5
[20] https://theingots.org/community/decl3u1i
[21] https://theingots.org/community/decl3u2x#1.1
[22] https://theingots.org/community/decl3u2x#2.1
[23] https://theingots.org/community/decl3u2x#3.1
[24] https://theingots.org/community/decl3u2x#1.2
[25] https://theingots.org/community/decl3u2x#2.2
[26] https://theingots.org/community/decl3u2x#3.2
[27] https://theingots.org/community/decl3u2x#1.3
[28] https://theingots.org/community/decl3u2x#2.3
[29] https://theingots.org/community/decl3u2x#3.3
[30] https://theingots.org/community/decl3u2x#1.4
[31] https://theingots.org/community/decl3u2x#2.4
[32] https://theingots.org/community/decl3u2x#3.4
[33] https://theingots.org/community/decl3u2x#1.5
[34] https://theingots.org/community/decl3u2x#2.5
[35] https://theingots.org/community/decl3u2x#3.5
[36] https://theingots.org/community/decl3u2i
[37] https://theingots.org/community/decl3u3x#1.1
[38] https://theingots.org/community/decl3u3x#2.1
[39] https://theingots.org/community/decl3u3x#3.1
[40] https://theingots.org/community/decl3u3x#1.2
[41] https://theingots.org/community/decl3u3x#2.2
[42] https://theingots.org/community/decl3u3x#3.2
[43] https://theingots.org/community/decl3u3x#1.3
[44] https://theingots.org/community/decl3u3x#2.3
[45] https://theingots.org/community/decl3u3x#3.3
[46] https://theingots.org/community/decl3u3x#1.4
[47] https://theingots.org/community/decl3u3x#2.4
[48] https://theingots.org/community/decl3u3x#3.4
[49] https://theingots.org/community/decl3u3x#1.5
[50] https://theingots.org/community/decl3u3x#2.5
[51] https://theingots.org/community/decl3u3x#3.5
[52] https://theingots.org/community/decl3u3i
[53] https://theingots.org/community/decl3u4x#1.1
[54] https://theingots.org/community/decl3u4x#2.1
[55] https://theingots.org/community/decl3u4x#3.1
[56] https://theingots.org/community/decl3u4x#1.2
[57] https://theingots.org/community/decl3u4x#2.2
[58] https://theingots.org/community/decl3u4x#3.2
[59] https://theingots.org/community/decl3u4x#1.3
[60] https://theingots.org/community/decl3u4x#2.3
[61] https://theingots.org/community/decl3u4x#3.3
[62] https://theingots.org/community/decl3u4x#1.4
[63] https://theingots.org/community/decl3u4x#2.4
[64] https://theingots.org/community/decl3u4x#3.4
[65] https://theingots.org/community/decl3u4x#1.5
[66] https://theingots.org/community/decl3u4x#2.5
[67] https://theingots.org/community/decl3u4x#3.5
[68] https://theingots.org/community/decl3u4i
[69] https://theingots.org/community/decl3u5x#1.1
[70] https://theingots.org/community/decl3u5x#2.1
[71] https://theingots.org/community/decl3u5x#3.1
[72] https://theingots.org/community/decl3u5x#1.2
[73] https://theingots.org/community/decl3u5x#2.2
[74] https://theingots.org/community/decl3u5x#3.2
[75] https://theingots.org/community/decl3u5x#1.3
[76] https://theingots.org/community/decl3u5x#2.3
[77] https://theingots.org/community/decl3u5x#3.3
[78] https://theingots.org/community/decl3u5x#1.4
[79] https://theingots.org/community/decl3u5x#2.4
[80] https://theingots.org/community/decl3u5x#3.4
[81] https://theingots.org/community/decl3u5x#1.5
[82] https://theingots.org/community/decl3u5x#2.5
[83] https://theingots.org/community/decl3u5x#3.5
[84] https://theingots.org/community/decl3u5i